Accelerated bridge construction using 'Bridge Deck Erection Equipment (BDE)'

Accelerated bridge construction helps to shorten programs, to save resources and to reduce risks. It requires a coordinated approach and interface management between the bridge design and the design of the temporary works and the equipment. This presentation will explain this process, including:

Classification of bridge types and their decks.

Available deck construction methods.

What are temporary works.

What Equipment can be used to build bridge decks.

What decisions need to be made at early stages of design and planning.

How to specify temporary works and special equipment for a project.

Introduction of the Temporary Works Forum (TWf AU), a community of practice of Engineers Australia.

 

The webinar is hosted by the Civil and Structural Panel Sydney.

Speakers

Max Meyer

Principal, Ruifeng Engineering

Max Meyer has a master’s degree in civil engineering and an Honorary Doctorate from ETH in Zurich. He founded VSL’s Technical Centre for Asia/Australia in 1988 and has been VSL’s Group Technical Officer since 2013. He retired from VSL at end of October 2019. He started his own practice to offer to owners, consultants and contractors his expertise in structural engineering obtained from more than 35 years involvement in projects all over the world for design, detailing and construction of prestressed buildings, storage tanks, silos, containments, towers and prestressed or cable suspended bridges through moderation of brain storming sessions, conceptual & alternative designs, peer reviews of permanent work & temporary work and forensic engineering. Max has been and is sharing his knowledge with the civil engineering community through presentations in numerous conferences, seminars and workshops in many countries.